Skip to main content

Oil, gas & petrochemical

Shazand Arak Refinery

Two explosion-proof rack-and-pinion industrial elevators

What this project demanded

In a refinery's classified areas, every electrical device must be built so that any spark it produces cannot reach the atmosphere around it. That means the machine, controller, lighting and even the car pushbuttons have to be supplied in explosion-proof versions. Delivering two units at 80 and 60 metres in that environment covers Ex requirements, corrosion resistance and safe operator access to process levels at the same time.

This commentary is our technical reading of what this class of project requires, written from the recorded scope of work.

Rack-and-pinion industrial elevator — Shazand Arak Refinery
Rack-and-pinion industrial elevator — Shazand Arak Refinery

Project record

Sector
Oil, gas & petrochemical
Address
Arak
Delivery detail
80 m and 60 m travel — explosion proof

Oil, gas & petrochemical

Related projects

View all
  • Oil, gas & petrochemical

    Mahshahr

    Razi Petrochemical — packaging unit

    Design, sale, transport and installation of one elevator, with excavation, fabrication and installation of a self-supporting steel structure, and wall and machine-room covering in 3D Panel — EPC contract

    Environment with specific petrochemical contamination and surface water from proximity to the sea

  • Oil, gas & petrochemical

    Imam Khomeini Oil Refining Co., Shazand

    Two industrial elevators

    EPC contract

  • Oil, gas & petrochemical

    Oil Equipment Industries Co.

    Industrial elevator

Back to all projects

Have a project in hand?

Send us your project details. Our engineers will review them and come back with a proposed solution and an initial estimate.